- 29 Jul 2025
- 1 Minute to read
- Print
- PDF
Risk
- Updated on 29 Jul 2025
- 1 Minute to read
- Print
- PDF
You can configure the level of risk for the Problem Records (PR) to take necessary measures based on the specified Risk for the PR.
Configure Risk
To configure Risk, perform the following steps:
Navigate to Problem > Configuration > Risk.
Figure: Risk
Select the required Department.
Figure: Department
Click Add New or
icon.
Specify the required details on Risk Details page. For more information about the fields on the Field Configuration page, see Field Description.
Figure: Risk Details Page
Field Description
The following table describes the fields on the Risk Details page:
Field | Description |
Details | |
Risk Name | Type in a name for the Risk. |
Sort Order | Type in the order number in which order the Risk needs to be displayed in the Risks table. |
High Risk | Select check box to configure the Risk is as High Risk. |
Active | Indicates the status set for a Risk.
|
Click Submit. A new Risk value is configured.
Actions
This section explains all the icons displayed on the right-side panel of the Risk page.
Show List
Click Show List or to display the LIST table showing all the Risk values configured for the selected Department.
Figure: RISK page: List of Risk values
To edit a Risk value, click the Risk Name. Make the appropriate changes and click Submit.
To display the inactive Risk values, click the Include Inactive check box.
Note
When the Risk values are displayed in a list, Add New is displayed on the right-side panel. Click Add New to configure a new Risk value.